Pulling up an old floor is the messiest part of any renovation, and the part most people underestimate. Carpet comes up easily enough; the tack strips, staples and glued underlay beneath it do not. Tiles need breaking out. Bonded timber has to be prised off and the adhesive dealt with afterwards. Then there is the question of where several tonnes of it goes.
We handle all of it — take up, load out and disposal — and hand back a bare, swept slab ready for preparation. Because we are a floor preparation company, we remove floors the way the next trade needs them removed: without gouging the slab, without leaving adhesive ridges that make levelling more expensive, and without damaging skirtings or door frames you intend to keep.
Every job is priced per square metre after a site assessment, and the quote covers both removal and disposal — there are no separate tip fees afterwards.
What moves the price:
If your property was built or renovated before the late 1980s, the floor covering may contain asbestos. Vinyl floor tiles, the backing on sheet vinyl and some older adhesives are the usual culprits, and they are not something to guess about.
We do not remove asbestos-containing materials. If we suspect asbestos during assessment, we stop and recommend testing by a licensed assessor. Once the material has been cleared, or removed by a licensed contractor, we complete the rest of the job.
A typical two-bedroom unit of carpet is usually half a day. Glued tiles over the same area can take two days or more, because the adhesive bed has to come off as well as the tile.
Usually yes, though tile removal is loud and dusty and most clients prefer to be out for that. We seal off the work area from the rest of the property.
We take it. Removal and disposal are included in the quoted price, and material is taken to a licensed resource recovery facility. You do not need to arrange a skip.
Tile removal leaves adhesive residue and some surface scarring, which is normal and expected. It is why diamond grinding follows removal, and why sub-floor levelling follows grinding. Removal, grinding and levelling are three parts of one job, and we do all three.
Carpet and underlay, ceramic and porcelain tiles, slate and natural stone, solid and engineered timber, parquetry, laminate, hybrid, vinyl, lino and epoxy coatings.
Yes. We work regularly in Sydney apartment buildings, including within booked lift and loading dock times, and we protect common areas as we carry material out. Check whether your by-laws require notice or strata approval before renovation works begin.
Once the old floor is out, we grind the slab back to remove adhesive residue, then level the sub-floor so your new flooring goes down flat.
Over 15 years industry experience, we work to ensure you can achieve your required deadlines, with exceptional customer service and communication throughout the entire process.
GET A QUOTE